IGNOU BCA 6th Semester BCSP-064 PROJECT GUIDELINES
C A L E N D A R F O R T H E P R O J E C T
Sl.No.
|
Topic
|
Date
| |
1.
|
Submission of a Guide‟s bio-data and project
|
Twice a year as shown
| |
proposal at the following address:
|
below:
| ||
The Regional Director of your Regional
|
1st April to 30th June
| ||
or
| |||
Centre
| |||
1st October to 31st December
| |||
2.
|
Approval of Project
|
30 days after the project
| |
proposal is received.
| |||
3.
|
Submission of the Project Report (one copy) in
|
Twice a year as shown
| |
bound form to:
|
below:
| ||
The Regional Director of your Regional
|
1st July to 30th September
| ||
Centre
|
(For Project Proposal that
| ||
have been approved during
| |||
the 1st April to 30th June slot)
| |||
or
| |||
1st January to 31st March
| |||
(For Project Proposal that
| |||
have been approved during
| |||
1st October to 31st December
| |||
slot)
| |||
4.
|
Viva-Voce to be conducted
|
In July (For project reports
| |
submitted during 1st January -
| |||
31st March slot)
| |||
In January (For project
| |||
reports submitted during
| |||
1st July – 30th September slot)
|
PAGES REQUIRED FOR IGNOU BCA BCSP064
Dear Learners ,
For Synopsis - Approx 15 to 20 Pages required
For Project Report - Approx 120 to 150 or more pages required.
Dear Learners ,
For Synopsis - Approx 15 to 20 Pages required
For Project Report - Approx 120 to 150 or more pages required.
TYPE OF PROJECT
As majority of the students are expected to work out a real life project in some industry/research and development laboratories/educational institutions/software companies, it is suggested that the project is to be chosen which should have some direct relevance in day-to-day activities of the candidates in his/her institution. Students are encouraged to work in the areas listed at the end. However, it is not mandatory for a student to work on a real life project. The student can formulate a project problem with the help of Guide.
PROJECT PROPOSAL (SYNOPSIS)
The project proposal should be prepared in consultation with your guide. The project proposal should clearly state the project objectives and the environment of the proposed project to be undertaken.
The project work should compulsorily include the software development. The project proposal should contain complete details in the following form:
1. Title of the Project
2. Introduction and Objectives of the Project
3. Project Category (RDBMS/OOPS/Networking/Multimedia/Artificial Intelligence/Expert Systems etc.)
4. Analysis (DFDs at least up to second level , ER Diagrams/ Class Diagrams/ Database Design etc. as per the project requirements).
5. A complete structure which includes:
Number of modules and their description to provide an estimation of the student‟s effort on the project.
Data Structures as per the project requirements for all the modules. Process Logic of each module.
Testing process to be used.
Reports generation ( Mention tentative content of report)
6. Tools / Platform, Hardware and Software Requirement specifications
7. Are you doing this project for any Industry/Client? Mention Yes/No. If Yes, Mention the Name and Address of the Industry or Client
8. Future scope and further enhancement of the project.
ELIGIBILITY OF PROJECT GUIDE
1. A person having Ph.D./M.Tech. in Computer Science.
OR
2. A person having B.E/B.Tech (Computer Science), MCA, M.Sc (Computer Science) with minimum 2 years experience in Industry / Teaching.
ITEMS TO BE INCLUDED IN THE PROJECT REPORT
The following items should be included in the Project Report:
1. The project report must contain the following:
Introduction
Objectives Tools/Environment Used
Analysis Document (This should include SRS in proper structure based on Software Engineering concepts, E-R diagrams/Class diagrams/any related diagrams (if the former are not applicable), Data flow diagrams/other similar diagrams (if the former is not applicable), Data dictionary)
Design Document (Modularization details, Data integrity & constraints including database design, Procedural design, User interface design)
Program code (Complete code (well indented)/Detailed specification instead of code*, Comments & Description. The program code should always be developed in such a way that it includes complete error handling, passing of parameters as required, placement of procedure/function statements as needed.)
Testing (Test case designs are to be included separately for Unit testing, Integration testing, System testing; Reports of the outcome of Unit testing, Integration testing, System testing are to be included separately. Also, details of debugging and code improvement are to be included.)
Input and Output Screens
Implementation of Security for the Software developed (In case, you have set up a User Name and Password for your software, you should ensure the security of User Name and Password during transmission to server)
Limitations of the Project Future Application of the Project Bibliography
LIST OF BROAD AREAS OF APPLICATION AND RELATED TOOLS
FRONT END / GUI Tools
|
:
|
Visual Basic, Power Builder, X-Windows (X/lib,
|
X/motif, X/Intrinsic), Oracle Developer 2000,VC++,
| ||
Jbuilder
| ||
RDBMS/BACK END
|
: Oracle, Ingres, Sybase, Progress, SQL Plus, Versant,
| |
MY SQL, SQL Server, DB2
| ||
LANGUAGES
|
:
|
C, C++, Java, VC++, C#, PHP
|
SCRIPTING LANGUAGES
|
:
|
PERL, SHELL Scripts(Unix), TcL/TK
|
RDBMS/BACK END
|
: Oracle, Ingres, Sybase, Progress, SQL Plus, Versant,
| |
MY SQL, SQL Server, DB2
| ||
MIDDLE WARE (COMPONENT)
|
COM/DCOM, Active-X, EJB, Rational Rose,
| |
TECHNOLOGIES
|
:
|
MSMQ, BEA, Message Q, MTS, CICS
|
UNIX INTERNALS
|
:
|
Device Drivers, Pipes, RPC, Threads, Sockets
|
ARCHITECTURAL CONCEPTS
|
:
|
CORBA, TUXEDO
|
INTERNET TECHNOLOGIES
|
: DHTML, Java script, VB Script, Perl & CGI script,
| |
HTML, Java, Active X, RMI, CORBA, SWING, JSP,
| ||
ASP, XML, EJB, Java Beans, Java Servlets, Visual
| ||
Age for JAVA, UML, VRML, WML, iPlanet, ATG,
| ||
BigTalk, CSS, XSL, Oracle ASP server, VB.Net,
| ||
AWT, J2EE, LDAP, ColdFusion
| ||
NETWORKING TECHNOLOGIES
|
: ATM, Frame Relay, TCP/IP, SNMP, GSM, VoIP, PPP,
| |
IP-PSTN, SONET/SDH
| ||
WIRELESS TECHNOLOGIES
|
: Blue Tooth, 3G, ISDN, EDGE
| |
REALTIME OPERATING SYSTEM/
|
QNX, LINUX, OSEK, DSP, VRTX, RTXC, Nucleus
| |
EMBEDDED SKILLS
|
:
| |
OPERATING SYSTEMS
|
:
|
WINDOWS 95/98/2000/ME, WINDOWS NT, UNIX,
|
LINUX, IRIX, SUN SOLARIS, HP/UX, PSOS,
| ||
VxWorks, AS400, AIX, WINDOWS XP, DOS
| ||
APPLICATIONS
|
:
|
Financial/ Manufacturing/ Multimedia/ Computer
|
Graphics/ Instructional Design/ Database Management
| ||
System/ Internet/ Intranet/ Computer Networking-
| ||
Communication Software/E-Commerce/ ERP / MRP/
| ||
TCP/IPInternals/Routing protocols/Socket
| ||
Programming/ Implementation of Switches & Routers
|